Project Warehouse Cost
Value of the stock held in the warehouse of a project site
Reports how much material value is still sitting in the warehouse of a project site, net of what has already been turned into production.
Features
- Stock Value on the project = value of the stock location of its warehouse − total production cost already done.
- Shown on the project form next to the warehouse, and available as an optional column in the project list.
- Snapshotted on the project updates.
Demo data
- Material delivered to the site warehouse and not consumed yet: concrete, scaffolding frames and cement bags.
- The site reports 6 176.00 of stock value, net of the production already done.
Developed by STeSI Consulting — Francesco Moccia <moccia.f@stesi.consulting>