Project Material Cost
Raw material, equipment and production cost of tasks and projects
Adds the material side of the project cost: raw material, equipment and subcontracted material, each budgeted, each tracked from the purchase and the inventory documents, plus the cost of the manufacturing orders of the task.
Features
- Budget per task: Estimated Raw Material Costs and Cost of Equipment.
- Actual cost per sector, from the invoiced journal items plus the stock moves of the task that are neither purchased nor invoiced (valued at standard price).
- Cost still to be invoiced per sector, computed on the remaining quantity of the confirmed purchase order lines with the v19 tax engine.
- Production cost of the task split between Done and To Do, from the BoM cost, the product cost and the actual production cost of its manufacturing orders.
- Project level charges: General Cost Percentage applied on the project value, and Other Charges.
- Remaining costs: Costs To Finish, and its raw material and subcontractor breakdown.
Demo data
- 118 000.00 of raw material and 13 000.00 of equipment budgeted across the four tasks of the site.
- A general cost of 8 % on the 390 000.00 project value (31 200.00) plus 15 000.00 of other charges.
- A reinforcement steel bill of 6 400.00 already charged to the structural task, next to the concrete (1 416.00) and the scaffolding (4 800.00) ordered but still to be invoiced.
- The custom furniture task produced in house: 8 cabinet modules, i.e. 840.00 of BoM cost and 1 440.00 of product cost to do.